I saw on a TV show the idea for these niches in the wall, for extra storage, and Jason and I added them as a last minute addition...
The shower is all set up and waiting on the glass door to arrive!!!
Tiling has been grouted - still needs to be sealed - but you can see where the shower handle is - the top is for the temperature selection, the bottom is for the water pressure.
The mirror and lights are up - and on a dimmer - - the lighting looks very nice!!!

I stepped back to get a final shot of the shower - - the shower head is going in this week - - VERY exciting!!!


Ok - so use your imagination a little - the cabinet to the left of the sink will not be there....
#1 - Recessed lighting over the shower installed....
#2 - Light boxes for the lighting on either side of the mirror installed (more to come on what the lighting will look like)
#3 Jason (of Z Construction) relocated all of the outlets and switches to one central location. He wanted me all to note that he did this as an "extra" as part of the job and a reflection on what a good contractor he is. Thanks Jason! Score one for the little guys...
#4 I put the speaker plates on. This took about 20 seconds. This was my contribution to the weekend.
More to come on "products" that will go in these lovely electrical outlets including lighting and the Whisperwarm fan!
Have you ever been taking a shower and have someone either flush or brush their teeth and suddenly (shock!) you are blasted with hot or cold water. No longer. This valve apparently will consistently balance temperature and allow you to set a temperature to assure that you will always have water of the same temperature....nifty, right?
Shameless Product Placement #2 
* The shower niche was built. Jason (of Z Construction) and I had significant conversation over the size and height of the niche. Apparently, I have a considerable amount of shower products and he felt that it needed to be made large enough to accomodate a small family.
* Plumbing fixtures were installed, along with a cut off valve and access door. I previously didn't have any of this, which again is an improvement thought up by Jason (of Z Construction). I will talk more about the shower fixtures in my next post